About the project

Challenges

  • Building a local control system for equipment or a process plant that does not require or does not have the ability to integrate with external systems.

  • Typical applications are a built-in PC in a control cabinet in close proximity to equipment or a process plant.

  • Building a local control system for equipment or a process unit.

Integration of geographically distributed information systems into rapidly changing processes and specific requirements for APCS.
The alpha platform provided the ability to configure and administer the entire project from a single development center. Thanks to the remote control of the system nodes and the implementation of project correctness checks, it was possible to reduce the number of errors during operation and increase the reliability of the system as a whole.

38 AWPs manage the entire system, ensuring uninterrupted oil transportation over more than 2,000 kilometers.

Information system

Integration of geographically distributed information systems into rapidly changing processes and specific requirements for APCS.
The alpha platform provided the ability to configure and administer the entire project from a single development center. Thanks to the remote control of the system nodes and the implementation of project correctness checks, it was possible to reduce the number of errors during operation and increase the reliability of the system as a whole.

38 AWPs manage the entire system, ensuring uninterrupted oil transportation over more than 2,000 kilometers.

  • Creating a GUI
  • Programming and debugging algorithms for the automation system
  • Setting up the communication system
  • Creating and connecting databases

Integration of geographically distributed information systems into rapidly changing processes and specific requirements for APCS. 38 AWPs manage the entire system, ensuring uninterrupted oil transportation over more than 2,000 kilometers.

“Alpha platform provided the ability to configure and administer the entire project from a single development center. Thanks to the remote control of the system nodes and the implementation of project correctness checks, it was possible to reduce the number of errors during operation and increase the reliability of the system as a whole. "



Results

Integration of geographically distributed information systems into rapidly changing processes and specific requirements for APCS.
The alpha platform provided the ability to configure and administer the entire project from a single development center. Thanks to the remote control of the system nodes and the implementation of project correctness checks, it was possible to reduce the number of errors during operation and increase the reliability of the system as a whole.

38 AWPs manage the entire system, ensuring uninterrupted oil transportation over more than 2,000 kilometers.